News

Cloud No. 7, Stuttgart
05/15
Topping Out Ceremony “Cloud No. 7”, Stuttgart

In May 2015, the topping out ceremony for the highrise building “Cloud No. 7” at the “Europaviertel” in Stuttgart was celebrated. Dipl.-Ing. Roland Wetzel is the proof engineer for the structure of this project. Photo: Madeline Lu / Schwäbische Wohnungs AG

02/15
Cement Plant, Qatar

Buildings of a cement plant in Qatar for the client “fcb ciment”. The project entails a Limestone Crusher, a Limestone Container, a Raw-Meal-Silo, a Preheater-Tower
and a Clinker-Silo.

04/14
Won Competition: Pedestrian and cycle bridge, Heilbronn

44 planning teams applied to enter the single-phase engineering competition, ten offices were invited. The jury awarded two second prizes to the design of Peter and Lochner / Bogenrieder independent architects and engineers for the design of GS / Wittfoht.

Graf Soden Junior High School, Friedrichshafen
02/14
Inauguration of the “Graf Soden Junior Highschool”

In February 2014, the extension building of the “Graf Soden Junior Highschool” in Friedrichshafen was inaugurated. The extension of the school building is a three-storey reinforced concrete structure, while the single-storey refectory is constructed in wood.

Phosphate Storage and Plant, Jorf Lasfar, Morocco
06/13
VINCI 2013 Innovation Award: Phosphatlager Jorf Lasfar, Marokko

The design and construction of the phosphate storage halls in Jorf Lasfar, Maroc, was awarded the “VINCI 2013 Innovation Award”

05/12
Exhibition at the Design Center Stuttgart

Exhibition at the Design Center Stuttgart. PUL Engineers is represented with several bridge-projects.

11/11
Opening of the Extension of the line U15 in Zuffenhausen

PUL Engineers was commissioned with the planning of the extension of subway line U15 by the Civil Engineering Office of the city of Stuttgart. Roofing structure and fittings of three stations on line U15 were to be planned.

Pedestrian Bridge, Tübingen-Nehren
02/11
Pedestrian and Cycle Bridge over the B27, Tübingen-Nehren

Traffic is now opened for the “Pedestrian and Cycle Bridge” crossing Bundesstraße B27 in Tübingen-Nehren. The project was developed in cooperation with the architecture office Roland Bogenrieder.

09/10
Highway bridge over the Nessetal

Highway bridge over the Nesse valley. With an overall length of 414 m the bridge was build as part of the the A4 in Thuringia, Germany.

03/10
Wastewater Treatment Plant, Mühlhausen

Completion of the structural work for the industrial buildings and reinforced concrete containers, the assembly of steel constructions begins.

05/09
Airtraffic Control Tower in Frankfurt / Main

After a 14-week construction period 11 of 13 sections of the tower shaft are completed. The tower shaft height now measures 56.40 m. The air traffic control tower, made of reinforced concrete, will measure 70 m as a finished structure.

05/09
Art at the Roundabout

The steel sculpture at the Augusten-Roundabout in Schorndorf was designed by the artist Robert Schad. It is composed of three bent steel pipes as square hollow profiles with a total length of approximately 10 m with a sculpture height of about 6,50 m.