The October calendar page of the Jubilee 2006 calendar shows the airport tower Dusseldorf. The Tower was a 2-storey floor building planned by us and completed in 2002.
Short Description
- Year
- Location
The October calendar page of the Jubilee 2006 calendar shows the airport tower Dusseldorf. The Tower was a 2-storey floor building planned by us and completed in 2002.